July/August 2014 Updates

July/August 2014 Updates

Just a quick pic to show the finished shower base pan. After it’s installed and the walls go up around it, then they should end up polishing it, which is when it will look much more attractive. Larry sent this pic to me today, so I thought I’d share it...
June 2014 Updates

June 2014 Updates

My Epson R3000 printer was test fitted in the drawer under what will be my workstation in the vintage bus. It fits with almost no space to spare! I even have to find a 90° angle power cord to allow the drawer to close… I ordered one of those today, so I should...
May 2014 Updates

May 2014 Updates

Acquired a new old stock entry door hinge to replace mine, which was a bit saggy. Nice to be able to source factory new parts for a bus that is older than I am.   Ordered the materials for the shower and kitchen countertop today. The light color will be used for...
April 2014 Updates

April 2014 Updates

Four reading lights have been received at the shop. Two of these will go in the bedroom and two more in the living room. They automatically turn on when they are swung away from their wall fixture.   I finally got ahold of a bunch of fluted stainless steel siding...
February 2014 Updates

February 2014 Updates

Just acquired a fancy home automation system for the vintage bus. I was going to use e-plex, but it was starting to get too difficult dealing with the people who implement it and it was much more expensive. I think I’ve found a more modern system that I can...
January 2014 Updates

January 2014 Updates

Clockwise from upper left: 1) Here you’re looking at the bedroom from the hallway where you can see the upper cabinet has had it’s finish done. The door is also done, it’s just not in place to prevent damage from working around it. 2) Looking toward...
November/December 2013 Updates

November/December 2013 Updates

Here are some pics for all of you who like to geek out about RV systems. Clockwise from upper left: 1) Electronic dump valves x2. There’s the same setup on the opposite side of the bus so I can dump from either side. 2) Hydronic heat register… the red...
October 2013 Updates

October 2013 Updates

Here are a few shots of the cabinet that will be installed above our workstation booth. You can see it before and after the final finish was applied. Here you can see the workstation booth. The last shot is one of the cabinet that will appear across the isle from the...
Interior Being Installed Permanently!

Interior Being Installed Permanently!

The next chapter of this progress is moving along. Here’s what’s progressed since my last update: The interior has been stripped down to bare metal, any rust spots have been repaired and then the metal areas have been professionally painted. Much of the...
September 2013 Updates

September 2013 Updates

One that lacquer is applied, the richness of the wood really comes out. Here you can see some of the walls after the final finish is applied. The areas that won’t have veneer applied are where the refrigerator and show are located. Check out the grain pattern...