More progress shots clockwise from upper left:
1) Dash stripped down to bare metal and any unneeded holes patched.
2) The same has been done to the window surrounds.
3) Dash started to be primed for paint.
4) WIndow surrounds also primed and ready for paint.
Clockwise from upper left:
1) Dash area painted.
2) Entry area painted.
3 & 4) Passenger and driver’s side window surrounds both painted.
After the final dry fitting, they make sure all electrical and plumbing runs work out nicely and photograph each floor area to document where everything is run just in case I need to find something in the future.

